[Kolab-devel] [issue728] Toltec Connector uploads wrong XML data for recurring events with end date of recurrence

Andreas Gungl kolab-issues at intevation.de
Wed Apr 27 10:29:48 CEST 2005


New submission from Andreas Gungl <a.gungl at gmx.de>:

I've created a new event in Outlook 2000 (version 9.0.0.2814 with Toltec  
2.0 RC0) as starting on Monday for 30 min with daily reccurrence and end  
date for recurrence on Thursday (April 28th).  
Here is what I get after the transfer to the server:  
  
<?xml version="1.0" encoding="UTF-8"?>  
<event version="1.0">  
  <product-id>Toltec Connector Open Format (2.0)</product-id>  
  <uid>TOLTEC.942FEEA946FB41D6882EC3DA0FC16719</uid>  
  <creation-date>2005-04-26T14:48:21Z</creation-date>  
  <last-modification-date>2005-04-26T14:48:21Z</last-modification-date>  
  <sensitivity>public</sensitivity>  
  <summary>Test Andreas</summary>  
  <start-date>2005-04-25T06:00:00Z</start-date>  
  <end-date>2005-04-25T06:30:00Z</end-date>  
  <show-time-as>busy</show-time-as>  
  <color-label>none</color-label>  
  <creator><display-name>Jens</display-name>  
    <smtp-address>demo at osp-dd.de</smtp-address>  
  </creator>  
  <recurrence cycle="daily">  
    <interval>1</interval>  
    <range type="none"/>  
  </recurrence>  
</event>  
  
  
<range type="none" /> is clearly wrong. BTW I get the same error when  
using RC1 of the connector.

----------
messages: 4463
nosy: gungl at gmx.de
priority: bug
status: unread
title: Toltec Connector uploads wrong XML data for recurring events with end date of recurrence
topic: toltec
________________________________________________
Kolab issue tracker <kolab-issues at intevation.de>
<https://intevation.de/roundup/kolab/issue728>
________________________________________________




More information about the devel mailing list